Mine water cooperative optimal scheduling based on improved genetic algorithm
© 2024 The Author(s)..
This article addresses the issues of unreasonable water scheduling and high costs in coal mine shafts, proposing a hierarchical optimization scheduling strategy. Taking the water quality and quantity of a certain mining area in Inner Mongolia as the research object, it designs the objective function with the highest reuse efficiency and the lowest reuse cost of mine water resources, and establishes the constraint conditions of water quality and quantity for each water-using unit. In response to the problem that traditional genetic algorithms are prone to local optima, an adaptive autobiographical operator is proposed and improved based on Metropolis principle of simulated annealing algorithm. The improved algorithm is applied to the calculation of the scheduling model, and the results show that the recovery cost in the heating season is reduced by 66779.36 CNY/month, a decrease of 10.34%; the recovery cost in the non-heating season is reduced by 61469.28 CNY/month, a decrease of 9.91%. At the same time, the heating season and the non-heating season have reduced by 136.99 h/month and 154.52 h/month respectively, significantly reducing the recovery cost and time.
Medienart: |
E-Artikel |
---|
Erscheinungsjahr: |
2024 |
---|---|
Erschienen: |
2024 |
Enthalten in: |
Zur Gesamtaufnahme - volume:10 |
---|---|
Enthalten in: |
Heliyon - 10(2024), 6 vom: 30. März, Seite e27289 |
Sprache: |
Englisch |
---|
Beteiligte Personen: |
Liu, Yang [VerfasserIn] |
---|
Links: |
---|
Themen: |
Cooperative scheduling |
---|
Anmerkungen: |
Date Revised 22.03.2024 published: Electronic-eCollection Citation Status PubMed-not-MEDLINE |
---|
doi: |
10.1016/j.heliyon.2024.e27289 |
---|
funding: |
|
---|---|
Förderinstitution / Projekttitel: |
|
PPN (Katalog-ID): |
NLM369996143 |
---|
LEADER | 01000caa a22002652 4500 | ||
---|---|---|---|
001 | NLM369996143 | ||
003 | DE-627 | ||
005 | 20240323001449.0 | ||
007 | cr uuu---uuuuu | ||
008 | 240322s2024 xx |||||o 00| ||eng c | ||
024 | 7 | |a 10.1016/j.heliyon.2024.e27289 |2 doi | |
028 | 5 | 2 | |a pubmed24n1341.xml |
035 | |a (DE-627)NLM369996143 | ||
035 | |a (NLM)38510030 | ||
040 | |a DE-627 |b ger |c DE-627 |e rakwb | ||
041 | |a eng | ||
100 | 1 | |a Liu, Yang |e verfasserin |4 aut | |
245 | 1 | 0 | |a Mine water cooperative optimal scheduling based on improved genetic algorithm |
264 | 1 | |c 2024 | |
336 | |a Text |b txt |2 rdacontent | ||
337 | |a ƒaComputermedien |b c |2 rdamedia | ||
338 | |a ƒa Online-Ressource |b cr |2 rdacarrier | ||
500 | |a Date Revised 22.03.2024 | ||
500 | |a published: Electronic-eCollection | ||
500 | |a Citation Status PubMed-not-MEDLINE | ||
520 | |a © 2024 The Author(s). | ||
520 | |a This article addresses the issues of unreasonable water scheduling and high costs in coal mine shafts, proposing a hierarchical optimization scheduling strategy. Taking the water quality and quantity of a certain mining area in Inner Mongolia as the research object, it designs the objective function with the highest reuse efficiency and the lowest reuse cost of mine water resources, and establishes the constraint conditions of water quality and quantity for each water-using unit. In response to the problem that traditional genetic algorithms are prone to local optima, an adaptive autobiographical operator is proposed and improved based on Metropolis principle of simulated annealing algorithm. The improved algorithm is applied to the calculation of the scheduling model, and the results show that the recovery cost in the heating season is reduced by 66779.36 CNY/month, a decrease of 10.34%; the recovery cost in the non-heating season is reduced by 61469.28 CNY/month, a decrease of 9.91%. At the same time, the heating season and the non-heating season have reduced by 136.99 h/month and 154.52 h/month respectively, significantly reducing the recovery cost and time | ||
650 | 4 | |a Journal Article | |
650 | 4 | |a Cooperative scheduling | |
650 | 4 | |a Improved genetic algorithm | |
650 | 4 | |a Mine water | |
650 | 4 | |a Reuse cost | |
700 | 1 | |a Zhang, Zihang |e verfasserin |4 aut | |
700 | 1 | |a Zhu, Dongxu |e verfasserin |4 aut | |
700 | 1 | |a Bo, Lei |e verfasserin |4 aut | |
700 | 1 | |a Yang, Shangqing |e verfasserin |4 aut | |
700 | 1 | |a Yue, Yuangan |e verfasserin |4 aut | |
700 | 1 | |a Wang, Yiying |e verfasserin |4 aut | |
773 | 0 | 8 | |i Enthalten in |t Heliyon |d 2015 |g 10(2024), 6 vom: 30. März, Seite e27289 |w (DE-627)NLM255913095 |x 2405-8440 |7 nnns |
773 | 1 | 8 | |g volume:10 |g year:2024 |g number:6 |g day:30 |g month:03 |g pages:e27289 |
856 | 4 | 0 | |u http://dx.doi.org/10.1016/j.heliyon.2024.e27289 |3 Volltext |
912 | |a GBV_USEFLAG_A | ||
912 | |a GBV_NLM | ||
951 | |a AR | ||
952 | |d 10 |j 2024 |e 6 |b 30 |c 03 |h e27289 |